Oriental Square by OSI Holdings is steadily transforming daily. Glass installation and exterior stone cladding are progressing rapidly, staying firmly on track for handover in Q4/2025.

Key milestones:

1. Structure & Finishing:

• Structure: 100% completed

• Finishing: Brickwork 98%, plastering 95%, other finishing works 65%

2. Elevators:

• All elevator equipment has been delivered, and the installation of elevator doors is complete. Full installation is expected to finish by June, with the final inspection scheduled for 15/07.

3. MEP & Fire Protection:

• MEP systems: Basement works 98% complete; upper floors 93% (connection works in progress).

• Fire protection systems: 95% of works completed.

4. Façade:

• Glazing package: 90% of the glass and 100% of the aluminum have arrived in Vietnam. On-site installation has reached 35% and is expected to be completed from the 8th floor to the roof by 05/07.

• Stone cladding: 95% of exterior stone and 100% of elevator stone have been delivered; exterior stone installation progress is at 45%.

5. Show Unit:

• All construction, MEP, fire protection, elevator cladding, doors, and WC partitions have been completed. The show unit is scheduled for full completion in June.

Stay tuned for more exciting updates from the project!

3a
2a
1a
 

For detailed information or to schedule a visit, please get in touch with our Hotline — Oriental Square by OSI, which is ready to help you find your ideal workspace.

---

Oriental Square by OSI – Grade A Office at Starlake

Leasing Enquiries, please contact:

📍 Address: Plot H2CC1 - Central area of Tay Ho Tay urban area, Xuan Tao, Bac Tu Liem, Hanoi

🌐 Website: https://oriental-square.com.vn/

📱 Hotline: 0932 03 86 66